Healthcare Projects

Sheffield Children’s Hospital Aseptic Suite – Grade B, C and D

Bassaire Cleanrooms delivered a design and build of the new Aseptic Suite at Sheffield Children’s Hospital. Bassaire also successfully completed the commissioning and validation of the entire suite, including all DQ/IQ/OQ activities to achieve MHRA compliance.

Example CYTO room with isolators
  • Turnkey D&B - Architectural, HVAC and electrical services

  • Suite - area of just over 285m2

  • The facility consists of 2 negative pressure isolators for MABS Room / CYTO room, 3 positive pressure isolators in the AB Rooms and 2 HLAF’s

Clatterbridge Cancer Hospital Aseptic Suite – Grade B, C and D

Bassaire Cleanrooms delivered a design and build of the new Aseptic ATIMP and Gene Therapy Suites at Clatterbridge Cancer Hospital. Bassaire also successfully completed the validation of the entire suite, including all DQ/IQ/OQ activities to comply with MHRA requirements.

  • The facility covers an area of just under 600m2

  • Consists of; two Isolator rooms, Inner Support, Outer Support, Change rooms, Release room, Admin room and a Cold Store.

Example support room

North Lincoln Hospital Aseptic Suite – Grade B, C and D

Bassaire Cleanrooms completed the design, build and construction of the new Aseptic Suite at Grimsby Hospital. Bassaire also successfully completed the commissioning and validation of the entire suite, including all DQ/IQ/OQ activities in order to comply with MHRA requirements.

Example cleanroom image
  • The facility consists of three cleanrooms; one for Chemotherapy containing 2 negative pressure isolators, a second for MAB Therapy containing 2 negative pressure isolators and the third for CIVAS containing 2 recirculating positive pressure isolators.

Baxter Healthcare (Oxford)

The new Aseptic compounding suite was built to allow Baxter Healthcare to service hospitals within a 20-mile radius with their compounded products. The facility was built within an existing shell and comprises of Grade C compounding rooms containing 10 isolators, each with rapid gassing facility using VHP

The works undertaken by Bassaire included all aspects of the project from; structural assessments, planning permission, building control compliance, HVAC, Electrical and Civil works design, installation, commissioning and validation.

Multiple Isolator installation