ISO 8 packaging cleanroom

Cleanroom case study: Wasdell Packaging

Bassaire were awarded the contract for the design, build and construction of Wasdell's GMP packaging facility.

Selected on the basis of extensive fast track delivery expertise; Bassaire completed the design, installation, testing and validation of this specialist MHRA inspected, 1200m2 ISO Class 8 packaging facility within a demanding timeframe.

With service design, procurement and installation completed within a 12 week period, this allowed early beneficial occupation of the cleanroom suite by the client to safely install, assemble and ready for production his critical packaging and production equipment lines.

Close control of the facility environment included the design and provision of a comprehensive air pressure cascade system to suit both positive and negative pressure areas. Close control of individual room temperatures was combined with critical low humidity applications to offer performance control down to 20%.

Project delivery was completed by the provision of comprehensive IQ and OQ validation activities successfully executed and completed at the first time of asking by Bassaire's in-house team.