Bassaire successfully constructed the 400 square meter facility on a turnkey contract as well as being the main contractor.
Pharmaceutical grade A, B, C and D areas were validated to MCA standards.
Not only did Bassaire construct the facility but also manufactured the Grade A laminar flow benches using a combination of stainless and powder coated steel.
Baxter Healthcare (Thetford) case study datasheet (PDF) 367 KB
Back to the Case Studies Overview page